Certification
Certificate of Utility Model Patent
Production Time
Stock Material 1-3 Days; 5-14 Days for Large Order
Installation
Tin Rooftop or Flat Concrete
Max Wind Speed
Up to 130mph (60m/S)
Snow Load
Up to 30PSF (1.4kN/M2)
Color
Natural Silver/Black
Surface Treatment
Anodizing / Electrophoresis
Tilt Angle
10-15, 15-30, 30-60 Degree or Custom
Panel Direction
Vertical or Landscape
Are you a factory or trading company?
We are a direct manufacturer in China specializing in solar mounting systems. We provide multi-choice mounting solutions for roofs, ground, and RV applications.
What is the typical production lead time?
Stock items require 1-3 days. Mass production typically takes 7-15 days, depending on the specific order quantity.
Is there a minimum order quantity (MOQ)?
We do not have a strict MOQ for our standard current products; 1 piece for quality testing is available. For ODM/OEM items, an MOQ is required based on technical requirements.
Can I obtain a sample for testing?
Yes, we provide free samples of standard products from our showroom (shipping costs apply). For customized samples, a sample charge is required.
How are the goods shipped and how long does it take?
Sample orders are shipped via DHL or FedEx (3-5 days). Large orders are generally shipped by sea, taking 15-30 days depending on the destination port.
Do you offer OEM or ODM services?
Yes, we provide comprehensive OEM and ODM services, including customized logos and tailored packaging solutions based on your artwork.